Recent work

Call us today:
01392 269630

This page details some of our recent work. Click the headings below for more information.

Flood prevention works to electrical substation

Flood prevention works to electrical substation

Here we provided the necesssary materials and skills to remove flash flood water from an electrical substation.

Read More

3.5kW system completed in February

3.5kW system completed in February

Customers request was to maximise the amount of space on the roof and for the modules to be black. Using an Ever-Solar TL3200 and 14no. Caymax 250watt mono panels the customer can expect a very good yield of approximately 3220kwh.  

Read More

Bund pump installation completed December

Bund pump installation completed December

Installation of two transformer bund pumps to a site near Tavistock. The system consists of a control panel and pump/sensor unit. The control panel is normally mounted in a position that is accessible and the pump/sensor unit is mounted in a sump which is built into the bund around the transformer. The system continuously monitors the levels of rainwater and oil collecting in the bund. When a...

Read More

4.0kW System completed in November.

4.0kW System completed in November.

Customer wanted a 4kW system to be installed in his field but didn’t want a metal frame so with the help of Gary Way Builders we constructed a timber frame structure to mount them on. Using an Ever-Solar TL4000GB inverter and 16no. Caymax 250watt mono panels the customer can expect to achieve an annual yield of 3900kwh.

Read More